VALERO MCKEE CENTRAL CONTROL ROOM

Sunray, Texas

DESIGN BUILD CONTRACTOR
Bartlett Cocke Industrial


ARCHITECT
RVK


SIZE
12,000 SF 


COMPLETION
2018


HIGHLIGHTS
The entire facility design to withstand a 3 psi over pressure plant event.  Blast dampers were utilized on all building exhausts and outdoor air intakes.  High speed actuating lab valves were utilized in the entry vestibules to maintain the facilities positive pressure.